Lymington Harbour — Marina Pontoon Replacement Programme
Client: Lymington Harbour CommissionersLymington, Hampshire2023–2024Harbour & Marina Infrastructure, Structural Surveys
Lymington Harbour Commissioners appointed Ocean Leap Solutions to survey and assess their ageing pontoon system serving 350 leisure berths in the Town Quay marina. The existing timber-framed pontoons had been in service for over 25 years and were showing significant signs of structural deterioration.
We carried out a comprehensive above-water and dive-supported inspection programme, including material sampling and laboratory testing. Our condition assessment identified critical structural deficiencies in 40% of the pontoon frames, along with widespread fastener corrosion and flotation degradation.
Based on our findings, we developed a phased replacement strategy that allowed the harbour to maintain operational berth capacity throughout the works. We prepared detailed design specifications for the replacement pontoon system, tender documentation, and provided technical support during contractor procurement. The £2.8 million programme was completed on schedule in spring 2024.